EQUIPMENT MANAGEMENT AND MAINTENANCE
oil pipe, oil cylinder, and accessories should be free of leaks, abnormal temperature rise at the lubrication part, oil pipe
and the detection and metering instruments should display leakage, oil and gas evaporation, etc., immediately shut down
normally. Sixth, check the sensitivity and reliability of electrical the machine for inspection and handling. Fourthly, regularly
safety protection devices such as emergency stop switches, check whether the pressure and temperature of the hydraulic
alarms, buzzers (indication signals), and safety interlock system are within the specified range. In case of oil circuit
devices, and adjust or repair them if necessary. Seventh, check blockage, pipeline leakage, oil temperature exceeding the
the sensitivity, effectiveness, and accuracy of electrical limit standard, oil and gas evaporation, etc., immediately shut down
devices such as travel switches and proximity switches, and the machine for inspection and handling. Fifthly, regularly
adjust or repair them if necessary. Eighth, check the "zero drift" check whether the pressure, flow rate, and temperature of
of detection devices, metering devices, or weighing systems, and the temperature control system meet the process technical
calibrate them if necessary. Ninth, verify the equipment operating requirements and whether there are any leaks. Sixthly,
parameters and production process parameters, and adjust them regularly check the lubrication condition of manual lubrication
if necessary to meet production needs. Tenth, conduct a no-load parts and timely replenish lubricating oil and grease. Seventhly,
test run before load operation to check for abnormalities such as inspect metal structural parts, components, connectors, etc.
vibration, abnormal noise, jamming, and leakage. Any existing for any abnormalities such as looseness, vibration, abnormal
problems should be repaired in time before load operation can be noise, fracture, deformation, wear, and detachment. Eighthly,
carried out. check whether the current of the main motor exceeds the
4.3.2 Operational requirements rated current, whether the temperature of the motor and its
The operational requirements are formulated based bearing positions exceeds the standard, and in case of obvious
on the equipment management system and the three-level vibration, smoke, and burnt smell, immediately shut down the
maintenance and care system. During equipment operation, machine for inspection and handling. Ninthly, inspect whether
a comprehensive inspection of the integrity, effectiveness, there are oil leakage and oil seepage phenomena in the high-
and safety of the equipment's operating status is conducted speed input shaft, low-speed output shaft, box (housing),
according to the equipment spot inspection standards, grease bearing gland, sealing surface, oil pipe, etc. of the reduction
supply standards, and intactness standards. Any issues gearbox; in case of abnormal noise, local heating (especially at
identified during the inspection should be promptly addressed the bearing position) during operation, shut down the machine
by shutting down the equipment to identify the cause and for inspection and handling when necessary. Tenthly, inspect
repairing it according to the equipment maintenance technical whether there are oil leakage, oil seepage, oil shortage, base
standards. It is prohibited to operate the equipment with defects cracking, loosening, etc. in the reducer, transmission, etc.
or potential safety hazards. Eleventhly, in case of mechanical limit and buffer device
Firstly, propose equipment operation procedures and failure, electrical safety protection device and limit switch
requirements based on the production process. According to malfunction, automatic detection device failure, emergency
the product production process, compile operation procedures, brake device failure, immediately shut down the machine for
regulations, and requirements for each process node, starting inspection and handling. The equipment can only be operated
from the raw material end and ending at the product output after restoring its normal performance. Twelfthly, immediately
end. Secondly, regularly check whether the pressure, flow rate, shut down the machine for inspection and handling when there
temperature, etc. of the compressed air, normal water, and is a burnt smell emitted from the distribution cabinet, control
cooling water systems meet the process technical requirements cabinet, and operation cabinet. Thirteenthly, pay attention to
and whether there are any leaks. Thirdly, regularly check observe whether there are abnormalities in the voltage, current,
whether the pressure, flow rate, and temperature of the temperature, pressure, flow rate, etc. on the operation panel
lubrication system meet the standards. In case of oil circuit during operation. Fourteenthly, it is strictly prohibited for
blockage, oil pressure reduction, insufficient oil volume, operators to set parameters that control the operating state of
Vol.52,2026 ·51·